Skip to main content

KfW Projects in Serbia

Energy efficiency through ecological coal quality management

Donor: Federal Ministry for Economic Cooperation and Development (BMZ)
Partners: Elektroprivreda Srbije (EPS)
Project period: 2012 – 2021

Challenges

  • Need for environmentally sound coal quality management in Kolubara coal mining.
  • Significant pollution from CO2, SO2, NOX emissions due to suboptimal quality of lignite composition mainly used in the Nikola Tesla Power Station.

Approach

Introduction of an open pit coal quality management system in the western part of the Kolubara mining basin. Coal-fired power plants should receive a uniform coal quality for energy production.

The total cost of the project is EUR 182 million (KfW: EUR 74 million, EBRD co-financing: EUR 80 million and EPS: EUR 28 million).

Results

The project  enables more efficient and cleaner energy production

© 2024 German Cooperation in Serbia. All rights reserved.